Home / All News / OTEDOLA BRIDGE DRAINAGE WORKS: LASG SUES FOR COOPERATION FROM MOTORISTS

OTEDOLA BRIDGE DRAINAGE WORKS: LASG SUES FOR COOPERATION FROM MOTORISTS

The Lagos State Government has urged motorists plying Otedola under-bridge to cooperate with Traffic Officials as traffic under the bridge will be narrowed to a single lane for four days starting from Wednesday 15th March 2017 when the excavation works of the on-going construction of Omole Jubilee Estate/Agiliti drainage channel commences.

The excavation works is to give room for the construction of culverts to de-flood Omole, Magodo, Shangisha, Agiliti, Mile 12, Otedola under bridge and part of Alausa.

Motorists are therefore enjoined to drive carefully and maintain a single lane, starting from the commencement date of the excavation works.

Lagosians are assured of the determination of the Lagos State Government to ensure a flood-free Lagos.

 

Check Also

LAGOS OPENS ‘CODELAGOS’, ‘EKO NKE KOO’ CENTRE AT ISOLO

The Lagos State announced the opening of ‘CodeLagos’ and ‘Eko Nke Koo’ centre at the …